Case Law Details
In re M/s Tata Projects Limited (GST AAR Kerala)
Advance Ruling regarding Design, realisation, integration and commissioning of 1.2m trisonic wind tunnel at VSSC, ISRO, Thiruvananthapuram.
Whether the supply under the contract for ‘Design, Realisation, Integration and Commissioning of 1.2m Trisonic Wind Tunnel at Vikram Sarabhai Space Centre, ISRO, Thiruvananthapuram can be considered as supply of equipment eligible for the concessional rate of GST under SLNo.243A of First Schedule of Notification No.01/2017 Integrated Tax Rate dtd.28-06-2017.
The supply under the contract cannot be considered as supply of equipment eligible for concessional rate of goods and services tax as per Sl.No.243B of First Schedule of Notification No.01/2017 Integrated Tax (Rate) dated 28.06.2017.
If the above supply is considered as works contract whether it would be covered under Entry Sl.No.3 of Notification No.08/2017 Integrated Tax (Rate) dtd.28-06-2017 as amended by Notification No.24/2017 Integrated Tax (Rate) dtd.21-09-2017 attracting GST at the rate of 12%.
Please become a Premium member. If you are already a Premium member, login here to access the full content.