Case Law Details
Case Name : In re Enexio Power Cooling Solutions Private Limited (GST AAR Andhra Pradesh)
Related Assessment Year :
Courts :
AAR Andhra Pradesh Advance Rulings
Upgrade to Basic or Premium to download.
Already Upgraded? Login here to access.
In re Enexio Power Cooling Solutions Private Limited (GST AAR Andhra Pradesh)
Whether the Air-Cooled condenser to be supplied by the applicant to the buyer for use in the waste-to-energy project is classifiable as ‘parts for the manufacture of waste to energy plants/devices’, attracting 5% IGST or 2.5% CGST and 2.5% APGST?
As per the material on record and the facts and submissions made by the applicant, it is construed that, Air – Cooled condenser is a part of the Waste to Energy plant, which falls under the entry 234 of Schedule I of Notification 1/2017- Central Tax (Rate) ...
This is premium content. Please become a Premium member. If you are already a member, login here to access the full content.
Kindly Refer to
Privacy Policy &
Complete Terms of Use and Disclaimer.

We have gone through the application filed by the applicant, supporting documents submitted and the explanation rendered during the personal hearing. The Applicant is a private limited company incorporated in India and is inter alia engaged in the design, manufacture, supply, and erection and commissioning of Air Cooled Condensers [ACC] and cooling towers for renewable energy devices.