SC Upholds Setting Aside of ₹995 Crore Arbitral Award for Contractual Violations and Unequal Treatment

Case Law Details

TaxGuru Citation
2025 taxguru.in 13833
Case Name
SEPCO Electric Power Construction Corporation Vs GMR Kamalanga Energy Ltd. (Supreme Court of India)
Appeal Number
Premium Access
Date of Judgement/Order
Premium Access
Subscribe to download.

Already Upgraded? Log in.

Advertisement

SEPCO Electric Power Construction Corporation Vs GMR Kamalanga Energy Ltd. (Supreme Court of India)

Summary: The Supreme Court of India, in SEPCO Electric Power Construction Corporation Vs GMR Kamalanga Energy Ltd., examined the permissible scope of judicial intervention in international commercial arbitration awards under Sections 34 and 37 of the Arbitration and Conciliation Act, 1996, particularly where an arbitral tribunal has allegedly exceeded its contractual jurisdiction, violated the principles of natural justice and discriminated between the contracting parties. The appeal arose from the judgment dated 27 September 2023 passed by the Division Bench of the Orissa High Court in ARBA (ICA) No. 1 of 2023, whereby the High Court set aside an arbitral award dated 7 September 2020, subsequently corrected on 17 November 2020, and the Single Judge’s judgment dated 17 June 2022 affirming the award. The arbitral award had resulted in a net financial liability of approximately ₹995 crore against GMR Kamalanga Energy Ltd. The Supreme Court examined whether the Division Bench had exceeded the limited jurisdiction available under Section 37 or whether the circumstances justified interference on grounds of violation of the fundamental policy of Indian law, contractual obligations, equal treatment of parties and the most basic notions of justice.

The dispute originated from several Engineering, Procurement and Construction (EPC) agreements executed between SEPCO Electric Power Construction Corporation, a Chinese EPC contractor, and GMR Kamalanga Energy Ltd. on 28 August 2008 for construction of three coal-fired thermal power generation units, each having a capacity of 350 MW, at Kamalanga village in Dhenkanal district of Odisha. The contractual framework comprised the Civil Works and Engineering, Erection, Testing and Commissioning Agreement (CWEETC Agreement), Guarantee and Co-ordination Agreement, Onshore Supply Agreement and Offshore Supply Agreement. Subsequently, a fourth power generation unit of equivalent capacity was incorporated through amendments dated 31 May 2010, which also revised the contractual prices and milestone dates. However, GMR suspended the work relating to Unit 4 in August 2011. As delays continued and disputes arose concerning contractual obligations, the parties met in Jinan City, China, and executed minutes of meeting dated 7 November 2012, referred to as the Jinan Agreement. Further disagreements ultimately resulted in SEPCO demobilising from the project site around January 2015, issuing a notice of dispute on 30 March 2015 and invoking arbitration through a notice dated 8 June 2015, leading to constitution of a three-member arbitral tribunal.

The arbitration proceedings involved extensive pleadings, documentary evidence, technical reports, expert opinions and submissions between April 2016 and September 2020, resulting in the formulation of 27 issues by the arbitral tribunal. SEPCO asserted that it had achieved the contractual milestones for Unit 1 on 9 May 2013, Unit 2 on 18 November 2013 and Unit 3 on 3 June 2014 through completion of Reliability Run Tests, and that GMR had taken control of Units 1 and 2 on 23 November 2013. GMR disputed these assertions and raised several counterclaims concerning delayed completion, technical deficiencies, defective performance and non-compliance with contractual requirements. One of the principal disputes concerned whether contractual notices under Clauses 4.2.5 and 7.3.2 of the amended CWEETC Agreement constituted mandatory prerequisites for claiming additional compensation and extension of time. Although SEPCO had not established compliance with the notice requirements, the arbitral tribunal examined the applicability of waiver and equitable estoppel, relying particularly upon correspondence exchanged between the parties on 18 and 29 March 2012. The tribunal concluded that the requirement of contractual notices stood waived, notwithstanding the existence of express contractual provisions restricting waiver and modification of the agreements.

The arbitral tribunal considered various claims relating to delays in handing over the project site, access to land, security arrangements, construction of boundary walls, disturbances caused by local villagers, availability of fuel and technical performance of the power generation units. It held that GMR had committed contractual breaches concerning site access, supply of compliant coal and fuel oil in the required quantities, and other project-related obligations that contributed to delays. The tribunal also examined the effect of the Jinan Agreement and concluded that although extensions of time had been granted to SEPCO, the original milestone dates had not been substituted and the financial entitlements of the parties had been preserved, subject to settlement of claims predating the agreement. The suspension of Unit 4 beyond the contractually permissible six-month period was also held to entitle SEPCO to reimbursement. However, the tribunal simultaneously accepted certain counterclaims of GMR concerning delayed completion, liquidated damages and defects in the attemperation flow, heavy fuel oil system, fly ash removal and ash handling systems. The invocation of bank guarantees was also examined, and restitution of amounts considered improperly retained by GMR was ordered. After determination of the respective claims and counterclaims and allowing contractual set-off, the award resulted in an approximate net liability of ₹995 crore against GMR.

Aggrieved by the arbitral award, GMR approached the Single Judge of the Orissa High Court under Section 34 of the Arbitration and Conciliation Act, contending that the award suffered from procedural irregularities, unequal treatment of parties, disregard of express contractual terms and adjudication beyond the pleadings. GMR submitted that Clause 25.5.3 of the amended CWEETC Agreement expressly prohibited any variation, amendment, modification or waiver unless recorded in writing and signed by or on behalf of both parties. It argued that the arbitral tribunal had nevertheless treated an email dated 18 March 2012 as constituting a waiver of contractual notices, even though the communication was allegedly confined to withdrawal of a specific suspension notice upon establishment of letters of credit. According to GMR, SEPCO benefited from this interpretation in relation to prolongation costs, grid synchronisation, fuel oil, coal supply and performance testing claims, while comparable counterclaims of GMR were rejected for failure to issue contractual notices. GMR alleged that the discriminatory approach had caused substantial financial prejudice and violated Section 18, which guarantees equal treatment of parties, as well as Section 34(2)(a)(iii), which protects the right of a party to present its case.

The Single Judge rejected GMR’s challenge and upheld the arbitral award through judgment dated 17 June 2022. The Court observed that Sections 12 and 13 of the Arbitration and Conciliation Act provided a mechanism for challenging the impartiality of arbitrators and that GMR had not invoked those provisions during the arbitration proceedings. It further held that allegations of discrimination and bias were insufficient to establish violation of the principles of natural justice in the absence of supporting evidence. Regarding contractual notices, the Single Judge accepted the tribunal’s examination of the correspondence exchanged in March 2012 and the Jinan Agreement, notwithstanding the contractual restrictions on oral modification and waiver. The Single Judge acknowledged that the material supporting the finding of waiver might be insufficient but concluded that such circumstances did not justify setting aside the award under the limited jurisdiction available under Section 34. GMR initially challenged the judgment before the Supreme Court in SLP (C) No. 12194 of 2022, wherein the operation of the Section 34 judgment was stayed on 25 July 2022. Subsequently, on 15 May 2023, the Supreme Court disposed of the proceedings after recording GMR’s undertaking to pursue its statutory appellate remedy before the Division Bench under Section 37.

The Division Bench of the Orissa High Court examined five principal issues concerning the legality of waiver of contractual notices, the effect of erroneous factual findings, interpretation of contractual provisions, dismissal of the Section 34 petition at the admission stage and whether the award was contrary to the fundamental principles of justice. While examining waiver, the Division Bench referred to Sections 62 and 63 of the Indian Contract Act, 1872, distinguishing alteration of a contract by mutual agreement from voluntary relinquishment of contractual rights. It observed that waiver must be founded on a deliberate intention to abandon a known right and cannot be inferred merely from ambiguous communications or conduct. The Division Bench also examined the doctrine of estoppel under Section 115 of the Indian Evidence Act, 1872, and concluded that the arbitral tribunal had failed to give effect to the express No Waiver and No Oral Modification clauses contained in the agreements. It further identified an erroneous recording of the permissible coal moisture range as 9% to 12%, whereas the correct contractual range was 7% to 15%. According to the Division Bench, this error materially affected the determination of responsibility for technical problems, project delays and the computation of liquidated damages. These findings were among the grounds on which the Division Bench concluded that the award could not be sustained.

The Division Bench also examined the compensation awarded to SEPCO in relation to the suspension of Unit 4, contractual termination rights and entitlement to payment upon completion of technical performance tests. SEPCO had claimed CNY 248,833,587 towards undelivered equipment for Unit 4, and the Division Bench questioned the evidentiary basis of the compensation awarded, particularly the absence of supporting ledgers and adequate documentation establishing payments or settlements with subcontractors. It further held that the arbitral tribunal had disregarded contractual restrictions governing termination and had recognised common law termination remedies despite the express contractual framework. Another significant finding concerned the award of approximately ₹255 crore towards the contractual price payable upon successful completion of performance tests. The Division Bench observed that the tribunal had recognised successful completion of the Performance Guarantee Test despite recording failure of the Unit Characteristics Test for Unit 1, which was a mandatory prerequisite. It concluded that the tribunal had effectively rewritten contractual milestone requirements and exceeded the authority conferred upon it by the agreements. Finding the award contrary to the fundamental policy of Indian law, natural justice and basic notions of justice, the Division Bench set aside the entire award and the Single Judge’s judgment.

Before the Supreme Court, SEPCO challenged the Division Bench’s interference on the ground that the jurisdiction of courts under Sections 34 and 37 of the Arbitration and Conciliation Act is extremely limited and does not permit a fresh examination of the evidence or substitution of the arbitral tribunal’s interpretation with an alternative judicial interpretation. Reliance was placed on Renusagar Power Co. Ltd. Vs General Electric Co., Associate Builders Vs Delhi Development Authority, Ssangyong Engineering and Construction Company Ltd. Vs National Highways Authority of India, UHL Power Company Ltd. and other judgments emphasising the finality of arbitral awards and minimal judicial intervention. SEPCO argued that the Division Bench had effectively conducted a merits review of the arbitral award and had interfered with findings relating to contractual notices, technical obligations, compensation and termination merely because another interpretation was possible. It also contended that certain grounds had not been raised before the Single Judge and could not subsequently be introduced in proceedings under Section 37. SEPCO defended the interpretation of the contractual notice provisions and the application of equitable estoppel, maintaining that the parties’ correspondence and conduct demonstrated that contractual notices had been dispensed with in relation to relevant claims.

GMR, conversely, submitted that the dispute did not concern a mere error in contractual interpretation or appreciation of evidence but involved fundamental jurisdictional and procedural defects that justified judicial intervention. It maintained that the tribunal had devised an independent case concerning waiver arising from the events of March 2012, even though SEPCO had not specifically advanced such a case, thereby depriving GMR of an opportunity to present evidence and respond to the relevant allegations. GMR further contended that the tribunal had disregarded the express contractual prohibition against modification or waiver without a written instrument signed by both parties. It emphasised that the tribunal had adopted inconsistent standards by granting SEPCO’s claims notwithstanding its admitted failure to issue contractual notices while rejecting GMR’s counterclaims for comparable non-compliance. Such an approach, according to GMR, violated Section 18 of the Arbitration and Conciliation Act and the fundamental principles of procedural fairness. GMR also defended the Division Bench’s findings concerning the tribunal’s departure from the contractual requirements governing performance tests, compensation and termination, arguing that the award could not be protected merely by invoking the general principle of limited judicial interference.

The Supreme Court commenced its examination by analysing the statutory framework governing challenges to arbitral awards under Section 34 of the Arbitration and Conciliation Act, 1996. It reiterated that arbitration is founded upon party autonomy and that courts cannot ordinarily sit in appeal over the findings of an arbitral tribunal or substitute their own interpretation merely because another view of the evidence or contractual provisions is possible. Nevertheless, the principle of minimal judicial interference does not confer unrestricted authority upon arbitrators or render arbitral awards immune from scrutiny where statutory grounds for interference are established. The Court examined the development of the concept of public policy through Renusagar Power Co. Ltd., ONGC Vs Saw Pipes Ltd., Associate Builders and Ssangyong Engineering, together with the legislative amendments restricting the scope of interference. In particular, the Court considered the evolving jurisprudence of Section 34 of the Arbitration and Conciliation Act, emphasising that the protection afforded to arbitral awards cannot override fundamental requirements of procedural fairness and justice. Since the present dispute concerned an India-seated international commercial arbitration, the statutory distinction between the public policy ground and the independent ground of patent illegality under Section 34(2A), which excludes international commercial arbitration, was material. The Supreme Court ultimately examined the award on the grounds of fundamental policy of Indian law, natural justice and unequal treatment rather than treating ordinary factual or legal errors as sufficient grounds for annulment.

The Supreme Court further examined the relationship between the jurisdiction exercised under Section 34 and the appellate jurisdiction conferred by Section 37 of the Arbitration and Conciliation Act. Referring to MMTC Limited Vs Vedanta Limited, UHL Power Company Limited and Konkan Railway Corporation Limited Vs Chenab Bridge Project Undertaking, the Court reiterated that the scope of interference under Section 37 is narrower than that available under Section 34. An appellate court cannot independently reconsider the merits of an arbitral award or undertake a fresh interpretation of contractual provisions merely because it considers another interpretation more appropriate. However, where the court exercising jurisdiction under Section 34 fails to recognise fundamental statutory violations, the appellate court is not precluded from correcting such an erroneous exercise of jurisdiction. The Supreme Court also considered the Constitution Bench decision in Gayatri Balasamy Vs ISG Novasoft Technologies Limited, which recognised limited judicial powers concerning severance of invalid portions of an arbitral award, correction of manifest clerical or computational errors and modification of post-award interest in appropriate circumstances. The Court clarified that these limited powers do not authorise general reconsideration of the merits of an award. Where invalid and valid portions are inseparably intertwined, partial annulment or modification cannot necessarily preserve the remaining award. The question of judicial intervention must therefore be determined by examining the nature and extent of the statutory violations rather than merely invoking the general principle of arbitral finality.

Another important aspect examined by the Supreme Court concerned the distinction between the substantive law governing the EPC agreements, the law governing the arbitration agreement and the procedural law applicable to arbitration. Clause 21.4 of the amended CWEETC Agreement stipulated that unresolved disputes would be referred to arbitration in Singapore in accordance with the Indian Arbitration and Conciliation Act, 1996. Clause 25.2, however, provided that the substantive agreement would be governed and construed in accordance with English law, expressly excluding the United Nations Convention on Contracts for the International Sale of Goods. Referring to Sections 20 and 28(1)(b)(i) of the Arbitration and Conciliation Act and the decisions in Disortho S.A.S. Vs Meril Life Sciences Private Limited, Government of India Vs Vedanta Limited and Enercon (India) Limited Vs Enercon GmbH, the Court explained the distinction between the juridical seat and the physical venue of arbitration. In the circumstances of the present agreements, the Court treated Singapore as the venue and Indian arbitration law as governing the arbitral process, while English law governed substantive contractual interpretation. It emphasised that party autonomy permits parties to select different laws governing substantive rights, arbitration agreements and procedural aspects, but such choices cannot override mandatory statutory requirements applicable to the juridical seat. Consequently, the award remained subject to scrutiny under the Indian Arbitration and Conciliation Act, including the applicable standards of Indian public policy and procedural fairness.

Turning to the issue of contractual notices and alleged waiver, the Supreme Court examined Clauses 25.5.1, 25.5.2 and 25.5.3 of the amended CWEETC Agreement, which collectively protected the contractual rights of both parties and expressly required that any modification, amendment or waiver be recorded in writing and signed by or on behalf of each party. The Court noted that the arbitral tribunal had rejected SEPCO’s contention that contractual notice requirements had been waived in March 2010 but subsequently proceeded to infer waiver from correspondence exchanged in March 2012 and the Jinan Agreement, although SEPCO had not specifically pleaded such a case. GMR had not been afforded an adequate opportunity to present evidence against the tribunal’s independently formulated theory of waiver. Referring to the United Kingdom Supreme Court’s decision in Rock Advertising Limited Vs MWB Business Exchange Centres Limited and the Indian Supreme Court’s decision in All India Power Engineer Federation Vs Sasan Power Limited, the Court observed that the requirements for establishing a valid estoppel or intentional relinquishment of contractual rights had not been satisfied. Clause 7.3.2 also expressly required SEPCO to submit notice within 72 hours of becoming aware of a cause of delay or disruption, followed by prescribed supporting details and documentation. The tribunal’s decision to dispense with these express obligations without establishing a legally sustainable waiver amounted to an impermissible modification of the contract. The Court reiterated that an arbitral award which rewrites a contract is liable to be set aside where the applicable statutory grounds for interference are established.

The Supreme Court also examined the tribunal’s obligation under Section 28(3) to take into account the contractual terms and applicable trade usages while making an award. Referring to ONGC Vs Saw Pipes Ltd., South East Asia Marine Engineering and Constructions Limited Vs Oil India Limited and Associated Engineering Co. Vs Government of Andhra Pradesh, the Court distinguished a permissible interpretation of an ambiguous contractual provision from an impermissible departure from the contractual framework defining the arbitrator’s jurisdiction. The Court particularly examined the contractual provisions governing Reliability Run Tests, Unit Characteristic Tests and Performance Guarantee Tests under Clauses 6.1.5, 6.1.6 and 6.1.7 of the amended CWEETC Agreement. Successful completion of the Reliability Run Test and Unit Characteristic Tests constituted express prerequisites for conducting the Performance Guarantee Test. Nevertheless, the arbitral tribunal had recognised successful completion of the Performance Guarantee Test for Unit 1 despite recording that the Unit Characteristic Test had failed. The Supreme Court held that this conclusion could not be justified as a permissible alternative interpretation because it directly contradicted the express sequence and conditions prescribed by the parties. It agreed with the Division Bench that the tribunal had effectively rewritten contractual milestone conditions while granting financial relief to SEPCO. The Court reaffirmed that arbitrators cannot rewrite contracts and that the existence of arbitral discretion does not authorise an award inconsistent with fundamental contractual obligations.

The Supreme Court finally addressed the discriminatory treatment of the parties and its consequences under Sections 18 and 34(2)(a)(iii) of the Arbitration and Conciliation Act. Section 18 mandates equal treatment and a full opportunity for each party to present its case. The Court found that the arbitral tribunal had granted claims in favour of SEPCO despite its admitted failure to issue contractual notices while rejecting counterclaims of GMR for failure to comply with equivalent requirements. This constituted a clear departure from the statutory requirement of equality and the principles of natural justice. The Supreme Court also rejected the Single Judge’s reasoning that GMR should have raised such objections during arbitration under the statutory mechanism for challenging arbitrators. It observed that GMR could not reasonably have anticipated the discriminatory treatment that became apparent only upon publication of the award. The Court considered the Single Judge’s rejection of these objections cursory and perverse, particularly when the judgment itself acknowledged the insufficiency of material supporting the alleged waiver. Although the jurisdiction under Sections 34 and 37 remains narrow, courts cannot disregard gross violations of fundamental procedural safeguards merely to preserve the commercial objective of arbitration. The Supreme Court held that the defects affected the award as a whole and that its valid and invalid portions could not be satisfactorily severed. Accordingly, the Court upheld the Division Bench’s judgment setting aside the entire arbitral award involving approximately ₹995 crore and the Single Judge’s judgment affirming it. SEPCO’s civil appeal was dismissed as devoid of merits, without any order as to costs, and all pending applications were disposed of.

Cases Discussed

Judgments relied upon or examined by the Supreme Court

  • Gayatri Balasamy Vs ISG Novasoft Technologies Limited (Supreme Court); (2025) 7 SCC 1. – Limited powers of courts to modify or sever arbitral awards.
  • Disortho S.A.S. Vs Meril Life Sciences Private Limited (Supreme Court); 2025 SCC OnLine SC 570. – Determination of law governing arbitration agreements.
  • Reliance Infrastructure Limited Vs State of Goa (Supreme Court); (2024) 1 SCC 479. – Restricted jurisdiction under Sections 34 and 37.
  • Delhi Metro Rail Corporation Limited Vs Delhi Airport Metro Express Private Limited (Supreme Court); (2024) 6 SCC 357. – Judicial interference with arbitral awards.
  • Konkan Railway Corporation Limited Vs Chenab Bridge Project Undertaking (Supreme Court); (2023) 9 SCC 85. – Prohibition against substituting an alternative contractual interpretation under Section 37.
  • Shilpa Sailesh Vs Varun Sreenivasan (Supreme Court); (2023) 14 SCC 231. – Exercise of constitutional powers under Article 142.
  • Narinder Singh and Sons Vs Union of India (Supreme Court); (2022) 18 SCC 690. – Unequal treatment and denial of full opportunity to present a case.
  • UHL Power Company Limited Vs State of Himachal Pradesh (Supreme Court); (2022) 4 SCC 116. – Narrow appellate jurisdiction under arbitration law.
  • Government of India Vs Vedanta Limited and Others (Supreme Court); (2020) 10 SCC 1. – Law governing arbitration and public policy of the juridical seat.
  • South East Asia Marine Engineering and Constructions Limited Vs Oil India Limited (Supreme Court); (2020) 5 SCC 164. – Contractual provisions must be interpreted harmoniously.
  • K. Sugumar and Another Vs Hindustan Petroleum Corporation Limited and Another (Supreme Court); (2020) 12 SCC 539. – Limited scope of interference under Section 34.
  • Ssangyong Engineering and Construction Company Limited Vs National Highways Authority of India (Supreme Court); (2019) 15 SCC 131. – Violation of natural justice, fundamental policy of Indian law and impermissible rewriting of contractual terms.
  • Dyna Technologies Private Limited Vs Crompton Greaves Limited (Supreme Court); (2019) 20 SCC 1. – Judicial restraint while examining arbitral awards.
  • Parsa Kente Collieries Limited Vs Rajasthan Rajya Vidyut Utpadan Nigam Limited (Supreme Court); (2019) 7 SCC 236. – Interference with arbitral awards only on recognised statutory grounds.
  • MMTC Limited Vs Vedanta Limited (Supreme Court); (2019) 4 SCC 163. – Appellate scrutiny under Section 37 cannot exceed the parameters prescribed under Section 34.
  • Rock Advertising Limited Vs MWB Business Exchange Centres Limited (United Kingdom Supreme Court); [2018] UKSC 24. – Enforceability of No Oral Modification clauses and requirements for establishing estoppel.
  • All India Power Engineer Federation and Others Vs Sasan Power Limited and Others (Supreme Court); (2017) 1 SCC 487. – Waiver requires intentional relinquishment of a known right.
  • Associate Builders Vs Delhi Development Authority (Supreme Court); (2015) 3 SCC 49. – Public policy, perversity and principles of natural justice in arbitration.
  • Enercon (India) Limited and Others Vs Enercon GmbH and Another (Supreme Court); (2014) 5 SCC 1. – Distinction between juridical seat and physical venue of arbitration.
  • McDermott International Inc. Vs Burn Standard Co. Ltd. and Others (Supreme Court); (2006) 11 SCC 181. – Supervisory jurisdiction of courts over arbitral proceedings.
  • Oil & Natural Gas Corporation Ltd. Vs Saw Pipes Ltd. (Supreme Court); (2003) 5 SCC 705. – Arbitrators must respect contractual obligations and statutory requirements.
  • Kuldeep Singh Vs Commissioner of Police and Others (Supreme Court); (1999) 2 SCC 10. – Principles governing perversity of findings.
  • Renusagar Power Co. Ltd. Vs General Electric Co. (Supreme Court); 1994 Supp (1) SCC 644. – Scope of public policy in arbitration.
  • H.B. Gandhi, Excise and Taxation Officer-cum-Assessing Authority, Karnal Vs Gopi Nath & Sons (Supreme Court); 1992 Supp (2) SCC 312. – Judicial scrutiny of perverse findings.
  • Associated Engineering Co. Vs Government of Andhra Pradesh and Another (Supreme Court); (1991) 4 SCC 93. – Arbitrators cannot exceed jurisdiction conferred by the contract.
  • Grindlays Bank Ltd. Vs Central Government Industrial Tribunal and Others (Supreme Court); 1980 Supp SCC 420. – Procedural corrections distinguished from substantive review.
  • Allen Berry and Co. Pvt. Ltd. Vs Union of India, New Delhi (Supreme Court); (1971) 1 SCC 295. – Judicial scrutiny of contractual documents incorporated into an arbitral award.
  • Babu Ram Vs Nanhemal (Supreme Court); Civil Appeal No. 107 of 1966; 05/12/1968. – Judicial interference where an error of law is apparent from the award.

Judgments discussed in party submissions and High Court proceedings

  • PSA Sical Terminals Private Limited Vs Board of Trustees of V.O. Chidambranar Port Trust Tuticorin and Others (Supreme Court); (2023) 15 SCC 781
  • Larsen Air Conditioning and Refrigeration Company Vs Union of India and Others (Supreme Court); 2023 INSC 708; (2023) 15 SCC 472
  • Gemini Bay Transcription Private Limited Vs Integrated Sales Service Limited and Another (Supreme Court); (2022) 1 SCC 753
  • Project Director, National Highways No. 45 E and 220, NHAI Vs M. Hakeem and Another (Supreme Court); (2021) 9 SCC 1.
  • Charles Lim Teng Siang & Anr. Vs Hong Choon Hau & Anr. (Singapore Court of Appeal); [2021] SGCA 43.
  • Mecamidi S.A. Vs Flovel MG Holdings Private Limited and Another (Delhi High Court); 2019 SCC OnLine Del 9414.
  • John Distilleries Pvt. Limited Vs Brihan Maharashtra Sugar Syndicate Limited (Bombay High Court); 2019 SCC OnLine Bom 67.
  • HRD Corporation (Marcus Oil and Chemical Division) Vs GAIL (India) Limited (Supreme Court); (2018) 12 SCC 471.
  • Chrisomar Corporation Vs MJR Steels Private Limited and Another (Supreme Court); (2018) 16 SCC 117.
  • Construction and Design Services Vs Delhi Development Authority (Supreme Court); (2015) 14 SCC 263.
  • Oil and Natural Gas Corporation Limited Vs Western Geco International Limited (Supreme Court); (2014) 9 SCC 263.
  • Pratima Chowdhury Vs Kalpana Mukherjee and Another (Supreme Court); (2014) 4 SCC 196.
  • N.K. Bajpai Vs Union of India and Another (Supreme Court); (2012) 4 SCC 653.
  • Bolin Chetia Vs Jogadish Bhuyan and Others (Supreme Court); (2005) 6 SCC 81.
  • B.L. Sreedhar and Others Vs K.M. Munireddy and Others (Supreme Court); (2003) 2 SCC 355.
  • Provash Chandra Dalui and Another Vs Biswanath Banerjee and Another (Supreme Court); 1989 Supp (1) SCC 487.
  • Daman Singh and Others Vs State of Punjab and Others (Supreme Court); (1985) 2 SCC 670.
  • P. Dasa Muni Reddy Vs P. Appa Rao (Supreme Court); (1974) 2 SCC 725.
  • Jagad Bandhu Chatterjee Vs Nilima Rani and Others (Supreme Court); (1969) 3 SCC 445.
  • Waman Shriniwas Kini Vs Ratilal Bhagwandas and Co. (Supreme Court); 1959 SCC OnLine SC 120.

Advertisement

Author Info

CA Sandeep Kanoi
Qualification: Graduate, CA in Job / Business, DD
Company: Taxguru Consultancy
Location: Mumbai, Maharashtra
Articles Published: 25,637

Join TaxGuru's Network for the latest updates on Income Tax, GST, Company Law, Corporate Laws and other related subjects.