Supreme Advertising Private Limited Vs Genus Power Infrastructures Limited (Delhi High Court)
Summary: The Delhi High Court, in Supreme Advertising Private Limited Vs Genus Power Infrastructures Limited, examined two cross-petitions instituted under Section 34 of the Arbitration and Conciliation Act, 1996, challenging different portions of the arbitral award dated 7 March 2014 and the modified award dated 17 May 2014. The dispute arose from several interconnected contractual arrangements, memoranda of understanding and joint venture agreements relating to electrification and infrastructure projects in Uttar Pradesh and Rajasthan. Justice Harish Vaidyanathan Shankar emphasised that the jurisdiction exercised by a court under Section 34 is supervisory rather than appellate and that interference with an arbitral award must remain confined to statutorily recognised grounds. The Court separately examined the objections raised by both parties concerning the constitution of the arbitral tribunal, contractual interpretation, material shortages, damages, limitation, execution of works and correction of the original arbitral award.
The factual background involved contractual arrangements between Supreme Advertising, formerly Hythro Engineers Private Limited/Hythro Power Corporation Limited, and Genus Power, formerly Genus Overseas Electronics Limited. In 2005, Uttar Pradesh Power Corporation Limited (UPPCL) floated tenders for electrification and renovation works in several towns, including Agra, Jhansi, Hardoi, Etawah, Varanasi, Firozabad and Shikohabad. The parties executed a memorandum of understanding dated 27 August 2005, effective from 11 July 2005, under which Genus Power was to undertake bidding and procurement activities, while Supreme Advertising was responsible for survey, engineering, erection and allied project works. The value of erection and civil works was stated to be approximately ₹59.05 crore. Subsequently, the parties entered into a joint venture agreement dated 2 September 2005 concerning electrification projects awarded by Jaipur Vidyut Vitran Nigam Limited (JVVNL) under the Rajiv Gandhi Gramin Vidyutikaran Yojana in Rajasthan.
Supreme Advertising claimed that it had established project offices, deployed technical personnel and machinery, and undertaken substantial execution work at various project sites. However, disputes subsequently arose regarding delayed supply of materials, withholding of payments against running account bills and alleged failure by Genus Power to discharge its contractual financial obligations. Genus Power disputed these allegations and maintained that Supreme Advertising had failed to execute works within the agreed timelines and contractual specifications, besides failing to furnish measurement books, approvals, certifications and other requisite documents. It further alleged that Supreme Advertising abandoned the projects around 19 August 2006, resulting in substantial contractual and financial liabilities. Following several meetings, the parties executed a memorandum of understanding dated 8 October 2006 concerning reconciliation of accounts, handing over of project sites, materials and pending financial obligations. As the disputes remained unresolved, arbitration proceedings were initiated.
Supreme Advertising challenged the constitution of the two-member arbitral tribunal comprising Justice J.R. Chopra (Retd.) and Justice P.C. Jain (Retd.), contending that the arbitration agreement contemplated three arbitrators and that an even-numbered tribunal violated Section 10 of the Arbitration and Conciliation Act. The High Court observed that the tribunal had been constituted pursuant to judicial proceedings before the Rajasthan High Court and that Supreme Advertising had consciously participated in the proceedings for several years. It had filed claims, produced documentary evidence, examined witnesses, cross-examined witnesses and invited adjudication on merits without raising any jurisdictional objection. Referring to Sections 4 and 16 of the Act and the Supreme Court judgment in Narayan Prasad Lohia Vs Nikunj Kumar Lohia, the Court held that Supreme Advertising could not challenge the tribunal’s composition merely because the award had not resulted entirely in its favour. The failure to raise a timely objection precluded the company from subsequently questioning the composition of the tribunal.
While examining the scope of judicial interference with arbitral awards, the High Court extensively referred to the Supreme Court judgment in OPG Power Generation (P) Ltd. Vs Enexio Power Cooling Solutions (India) (P) Ltd., which explained the principles governing public policy, patent illegality and perversity. The Court observed that a mere erroneous application of law or the possibility of arriving at a different factual conclusion does not automatically justify setting aside an award. An arbitral tribunal is ordinarily the final authority regarding the quality, quantity and appreciation of evidence placed before it. Courts cannot substitute their own interpretation of contractual documents merely because another interpretation appears possible. However, interference may be justified where findings are based on no evidence, vital evidence has been ignored, or the contractual interpretation adopted is not a reasonably possible view. Applying these principles, the High Court proceeded to examine the objections raised against the individual counterclaims.
Regarding Counterclaim No. 1 under Issue No. 13, concerning the alleged loss, shortage and misappropriation of materials, Supreme Advertising argued that the arbitral tribunal had accepted calculations and schedules prepared by Genus Power without sufficient independent documentary evidence. It contended that complete inventories, material reconciliation statements and contemporaneous records establishing actual misappropriation had not been produced. The High Court, however, observed that the tribunal had considered Supreme Advertising’s own declarations, documentary records, reconciliation statements, site verification reports and admissions elicited during cross-examination. Material valued at ₹53,31,67,000 was claimed to have been erected and utilised, whereas material worth ₹26,99,89,000 was supported by approvals, measurements and verifications, and material worth ₹6,13,14,000 was independently identified during site inspections. The tribunal accepted the reconciliation exercise reflected in Schedules RY-4 to RY-7. The original amount awarded under this counterclaim was ₹20,18,64,000, which was subsequently reduced to ₹18,39,00,000 through the modified award. The Court held that the methodology adopted by the tribunal constituted a plausible assessment of the available evidence.
The High Court also rejected Supreme Advertising’s contention that the arbitral award contained inherently contradictory findings because the tribunal had simultaneously allowed claims relating to execution of erection works and counterclaims concerning unaccounted materials. The Court explained that entitlement to payment for execution of work and accountability for materials supplied for such execution constituted two distinct questions. Acceptance of an erection claim did not automatically establish that every quantity of material reflected in the corresponding bills had been properly utilised, returned or accounted for. The tribunal was entitled to independently determine whether the materials claimed to have been utilised were actually traceable and verifiable. The Court further rejected the argument that material reconciliation had already been completed before the meeting dated 8 October 2006, observing that the tribunal had considered subsequent correspondence and admissions contradicting that contention. Questions regarding procurement cost, replacement cost, valuation methodology and sufficiency of documentary evidence could not be reopened merely because Supreme Advertising considered another methodology more appropriate.
With respect to Counterclaim No. 2 under Issue Nos. 14, 14(i) and 14(ii), involving dismantled materials and an award of ₹40,80,000 under the modified award, Supreme Advertising argued that Genus Power had failed to establish actual financial loss or liability through independent evidence. The company contended that the award was substantially based on Schedule RY-8 prepared by Genus Power and that the tribunal had incorrectly interpreted contractual obligations arising from agreements with the electricity authorities. The High Court found that the tribunal had examined contractual clauses requiring dismantling, transportation and deposit of dismantled materials in designated stores of the electricity authorities. It had also considered Supreme Advertising’s communication dated 2 January 2007, wherein the company represented that the dismantled materials had already been deposited with the concerned authorities. This communication was treated as a significant admission inconsistent with the subsequent contention that materials remained at project sites, stores or with subcontractors. The Court held that the award was supported by contractual documents, correspondence, admissions, oral testimony and reconciliation statements. Consequently, the challenge concerned the appreciation and sufficiency of evidence rather than a complete absence of evidence and did not warrant interference under Section 34.
Regarding Counterclaim No. 3 under Issue No. 9, concerning financial losses arising from delayed release of payments by the project authorities, Supreme Advertising contended that Genus Power had failed to establish a causal connection between the alleged delay and any act or omission attributable to Supreme Advertising. It argued that the withholding of payments could have arisen from circumstances independent of its contractual performance and that the tribunal had incorrectly imposed liability upon it. Genus Power maintained that the tribunal had considered the relevant evidence and surrounding circumstances demonstrating the financial exposure and commercial consequences arising from disruptions in project execution. The High Court examined the challenge within the restricted jurisdiction available under Section 34 and concluded that the findings did not suffer from perversity, patent illegality or any fundamental infirmity warranting interference. The Court reiterated that proceedings for setting aside an arbitral award cannot be used to undertake a fresh examination of factual disputes already adjudicated by the tribunal or to substitute a different assessment merely because another conclusion might also be possible.
Supreme Advertising additionally contended that the counterclaims were barred by limitation and that Section 3 of the Limitation Act, 1963 imposed a statutory obligation upon the arbitral tribunal to examine limitation irrespective of whether a specific objection had been raised. The High Court distinguished a pure question of law capable of determination on admitted facts from a mixed question of law and fact requiring further investigation. In the present case, determining limitation would require examination of the dates on which the respective causes of action accrued, whether the claims were continuing in nature, the effect of the memorandum dated 8 October 2006, subsequent correspondence, possible acknowledgements and circumstances affecting the computation of limitation. No issue concerning limitation had been framed before the tribunal, no specific evidence had been produced on that question, and the Section 34 petition itself contained no foundational pleadings challenging the counterclaims on limitation. Referring to decisions including Ramesh B. Desai Vs Bipin Vadilal Mehta, Union of India Vs Susaka Pvt. Ltd., National Highways Authority of India Vs Oriental Structural Engineers Ltd. and Delhi Transco Ltd. Vs Hindustan Urban Infrastructure Ltd., the Court rejected the belated objection, holding that entertaining it during final oral submissions would require an impermissible fresh factual inquiry.
Finally, the High Court examined whether the modified award dated 17 May 2014 constituted an impermissible substantive review of the original award or a permissible correction under Section 33 of the Arbitration and Conciliation Act. The Court acknowledged that an arbitral tribunal ordinarily becomes functus officio after rendering its award and possesses no substantive power of review. However, Section 33 expressly permits correction of computational, clerical, typographical and similar errors. The tribunal had individually scrutinised the corrections requested by Genus Power and rejected several proposed modifications that exceeded its statutory corrective jurisdiction. The corrections ultimately permitted concerned discrepancies in figures, calculations and transcription without altering substantive findings regarding liability, entitlement or merits. The Court clarified that a reduction in the amount awarded does not, by itself, establish substantive review; the decisive consideration is whether the tribunal reopened the adjudicatory process. The Court also independently examined Genus Power’s cross-petition challenging findings concerning business losses, Rajasthan bills, execution of works and contractual interpretation, notwithstanding the absence of independent oral submissions supporting that petition. Finding no patent illegality, perversity, jurisdictional error or violation of the fundamental policy of Indian law, the High Court dismissed both O.M.P. (COMM.) 115/2016 and O.M.P. (COMM.) 159/2016, disposed of pending applications and made no order as to costs.
Cases Discussed
Judicial precedents considered in the Court’s analysis
- OPG Power Generation (P) Ltd. Vs Enexio Power Cooling Solutions (India) (P) Ltd. (Supreme Court); (2025) 2 SCC 417.
- Municipal Corporation of Greater Mumbai Vs RV Anderson Associates Pvt. Ltd. (Supreme Court); 2026 SCC OnLine SC 354.
- Delhi Transco Ltd. Vs Hindustan Urban Infrastructure Ltd. (Delhi High Court); 2025:DHC:8941-DB.
- Aneja Constructions (India) Private Limited Vs Grim-Tech Projects (I) Private Limited (Delhi High Court); 2022 SCC OnLine Del 452.
- National Highways Authority of India Vs Oriental Structural Engineers Ltd. (Delhi High Court); 2018 SCC OnLine Del 12087.
- Union of India Vs Susaka Pvt. Ltd. (Supreme Court); (2018) 2 SCC 182.
- Ramesh B. Desai Vs Bipin Vadilal Mehta (Supreme Court); (2006) 5 SCC 638.
- Narayan Prasad Lohia Vs Nikunj Kumar Lohia (Supreme Court); (2002) 3 SCC 572. (Related TaxGuru discussion)