Sponsored
    Follow Us:
Sponsored
NOTIFICATION NO 120/2006, dated 16-5-2006
S.O. 723(E).—In exercise of the powers conferred by clause (6C) of section 10 of the Income-tax Act, 1961 (43 of 1961), the Central Government hereby declares that any income arising to the foreign companies specified in column (2) of the table given below, by way of royalty or fees for technical services received in pursuance of the agreements specified in column (3) of the table, entered into by them with the Government of India for providing the services specified in column (4) of the table, in or outside India relating to the projects connected with security of India, shall not be included in computing the total income of the said company under the Income – tax Act, 1961, provided that the income by way of royalty would be exempt from taxation if such income has arisen on or after the 1st April, 2003.
TABLE
Sl. No
Name & Address of Foreign Company
Contract Number and Date
Nature of technical services
(1)
(2)
(3)
(4)
1
M/s. Snecma Moteurs, 2, boulevard du General Martial Valin 75724-Paris Cedex 15 -France
KAV/FFEC/1081/GTRE dated 28.09.2001
Technical Audit of Design Works relating to The Kaveri Engine Programme
2
Federal State Unitary Enterprise “Russian Technologies”, 1, 1-ja Tveskaja-Yamskaja str., Moscow, 125818,
KAV/FFEC/1020/GTRE dated 01.03.2000
Exploratory Altitude Testing of Kaveri Engine
3
Federal State Unitary Enterprise, ‘Rosoboronexport”, 27/3, Stromynka Street, Moscow, Russia, 107076
Amendment No. 335634211707 to KAV/FFEC/1020/GTRE dated 01-03-2000
Exploratory Altitude Testing of Kaveri Engine
4
Federal State Unitary Enterprise, “Rosoboronexport”, 27/3, Stromynka Street, Moscow, Russia, 107076
P/135634011927-KAV/FFEC/1045/GTRE dated 22.03.2002
Fan Casing Containment Test for Kaveri Engine
5
Federal State Unitary Enterprise, ‘Rosoboronexport”, 27/3, Stromynka Street, Moscow, Russia 107076
P/135634011930-KAV/FFEC/1042/GTRE dated 22.03.2002
Testing for Main Combustor at Sea level and Altitude conditions
6
Scientific Centre, Russian Federation, M/s Gromov Flight Research Institute Zhukovski, Moscow Region.
KAV/FFEC/799/GTRE dated 22.03.2002
Various Technical services for Kaveri Engine
7.
M/s. Kolb+Baumann Prazisions-Messeuge Daimlerstra Be 24 D63741, Aschaffenburg, Germany
GTRE/MMG/FEKV/3026/ 02/FPO/03 dated 14.07.2003
Consultancy services for CMM using ‘KOBA STEP GAUGE” with GUK-S Software.
8.
M/s. ACRI, 260, Route Du Pin Montard BP 234-06904 Sophia Antipolis, France
KAV/FFEC/1065/GTRE dated 31.10.2001
Development of Software using 3D flow field analysis for the fabrication of Combustor for Kaveri Engine.
9.
Test Devices INC., 6, Loring Street, Hudson MA 01749, USA
GTRE/MMG/FEKV/3017/ 02/FPC/A/03 dated 30.09.2003
Over speed & Burst margin test on K6HPC Rotor assembly
10.
Test Devices INC., 6, Loring Street, Hudson MA 01749, USA
GTRE/MMG/FEKV/3018/ 02/FPC/A/03 dated 17.10.2003
Over speed & burst margin test on K6 Fan Rotor assembly
11.
Test Devices INC., 6, Loring Street, Hudson MA 01749, USA
GTRE/MMG/FEKV/3007/ 03/FPC/A/03 dated 20.03.2004
Design, Analysis, Testing & Optimization of Damper for the LP Turbine Rotor Blade
12.
MTU Aero Engines, GmbH & Co. KG Represented by MTU Aero engines Verwaltungs GmbH Postfach 50 06 40, 80976 Muenchen Germany
GTRE/MMG/FEKV/3009/ 03/FPC/A/04 dated 23.08.2004
Over speed & Burst Margin Test on K6HP Turbine Rotor Assembly
13.
MTU Aero Engines, GmbH & Co. KG Represented by MTU Aero engines Verwaltungs GmbH Postfach 50 06 40, 80976 Muenchen Germany
GTRE/MMG/FEKV/300 8/03/FPC/A/04 dated 23.08.2004
Over speed & Burst Margin Test on K6 LP Turbine Rotor Assembly
14.
M/s. Samtech S.A. Parc Scoemtofoque Du Sart Tilman Rue Des Chasseurs Ardemmais 8, B-4031, Angleur (Belgium)
GTRE/MMG/FEKV/301 9/02/FPC/03 dated 29.08.2003
Dynamic Analysis under Blade off condition of Kaveri engine
15.
Applied Technology Consultants Ltd., Holland House, 30, Old street, Clevedon BS 21 6BY, UK
KAV/FFEC/997/GTRE dated 31.08.1999
Consultancy for Reheat System Design Review/Audit
16.
Applied Technology Consultants Ltd., Holland House, 30, Old street, Clevedon BS 21 6BY, UK
KAV/FFEC/996/GTRE dated 31.08.1999
Consultancy for HP Turbine Risk Analysis/Review
17.
Applied Technology Consultants Ltd., Holland House, 30, Old street, Clevedon BS 21 6BY, UK
KAV/FFEC/998/GTRE dated 31.08.1999
Consultancy for Weight Reduction Study
18.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS 21 7RA, UK
KAV/FFEC/1011 /GTRE dated 28.10.1999
Consultancy for Thermal and Hydraulic Modelling of Kaveri Lubrication System
19.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS 21 7RA, UK
KAV/FFEC/1027A/GTRE dated 14.09.2000
Consultancy for Kaveri Fan Aerodynamic and Mechanical Design Review/Audit and enhancement.
20.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS 21 7RA, UK
KAV/FFEC/1028/GTRE dated 14.09.2000
Consultancy for Critical Design Review of the Kaveri Engine Project
21.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS21 7RA, UK
KAV/FFEC/1027/GTRE dated 14.09.2000
Consultancy for Accelerated Simulated Mission Endurance Test (ASMET) Cycle and test schedule definition and development programme integration.
22.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS21 7RA, UK
KAV/FFEC/1088/GTRE dated 12.06.2001
Consultancy for Kaveri Integrated Test, Development and Procurement programmes
23.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS21 7RA, UK
KAV/FFEC/1075/GTRE dated 05.07.2001
Consultancy for Kaveri PFRT Fan Aerodynamic Design 3D Blade-to-Blade and Viscous Analysis (ATC 506 issue 01)
24.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS21 7RA, UK
KAV/FFEC/1074/GTRE Dated 25.08.2001
Consultancy for Kaveri K4 Build 06 HP Compressor Blade Stage 1 Failure Investigation and Follow-up (ATC 507 issue 01)
25.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS21 7RA, UK
KAV/FFEC/1080/GTRE Dated 25.08.2001
Consultancy for Review and Proposal for the Resolution of Vibration Problems in the Kaveri Engine
26.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS21 7RA UK
KAV/FFEC/1089/GTRE Dated 12.06.2001
Consultancy for Design Review and Audit of High Temperature High Pressure Heat Transfer Rig
27.
Applied Technology Consultants Ltd., Brunel House, 5, Elton Road, Clevedon BS21 7RA, UK
KAV/FFEC/1080/GTRE Dated 22.01.2004
Consultancy for Kaveri K5 & K8 Compressor Blade Stage I vibration & Rub Investigation Problems in the Kaveri Engine
[F.No.200/95/2004-ITA-I]

Sponsored

Join Taxguru’s Network for Latest updates on Income Tax, GST, Company Law, Corporate Laws and other related subjects.

Leave a Comment

Your email address will not be published. Required fields are marked *

Sponsored
Sponsored
Ads Free tax News and Updates
Sponsored
Search Post by Date
February 2025
M T W T F S S
 12
3456789
10111213141516
17181920212223
2425262728